On the Inner West Council demolition register, Rozelle addresses come back more than once. The demolition Rozelle owners commission is usually one stage of a longer file rather than a single application that opens and closes.
Super Demolition works every address in postcode 2039 under a current Demolition Licence and a current Asbestos Removal Licence, and Inner West Council is the consent authority for all of them.
The NSW Planning Portal holds 138 demolition typed records for Rozelle in Inner West Council’s register. They sit across 104 addresses, so the file is not one entry per property. Of those, 28 carry more than one record, and between them hold 69 of the entries: half the suburb’s demolition file.
That is not a file of small amendments to consents already granted. Only 17 of the records are modification applications. Eighteen of the repeat addresses carry two or more entries that are separate applications in their own right, and on 19 of the 28 a record that never ran to a determination sits beside one that did.
None of them is ours or yours. What they show is that here the block accumulates a history, not the application, so before quoting we read what is recorded against your street number.
There are two ways a demolition is approved in New South Wales. A complying development certificate is issued by a private certifier against a fixed code, and nothing is weighed up: the land and the proposal meet every standard in it or the route is shut. A development application goes to Inner West Council, which weighs it on merit, notifies the neighbours its controls require, and can approve with conditions or refuse.
Rozelle’s own file leans hard to the second: 114 records sit on the development application side against 24 certificates. Eligibility turns on the land and on what is going back onto it. A standalone knockdown on unconstrained land is the usual certificate candidate; one tied to a subdivision or to multi dwelling housing is assessed on merit whatever the block is.
The demolition also does not have to travel with the rebuild. Here 34 of the records name demolition on its own, and some addresses appear twice because clearing the lot and building what replaces it went in separately. That matters while a builder’s design is still moving: the clearing can be settled when the rest is not.
Super Demolition is family owned and managed with over 30 years behind the work, and Jack owns it and usually walks the block with you. Before accepting any quote, ours included, ask to see a current Demolition Licence and a current Asbestos Removal Licence, and confirm staff and contractors comply with WorkCover requirements to AS 2601-2001. The credentials sit with our residential demolition service.
We hold a 5.0 rating across 84 reviews. The site assessment and the written quote cost nothing, and every enquiry is answered within 24 hours. Call 0455 888 819 to get someone out to the property.
A full demolition takes the house, garage, sheds, fencing, paving and the slab underneath, and hands the land back level. A partial one removes a rear section, an upper level or the internals while the rest stays standing, propped and weather protected. A strip-out takes fittings, linings, services and partitions out of a tenancy and leaves the structure alone, which our commercial demolition service covers.
Scope is settled before anything is lodged, for the reason the register makes plain: what goes in is what you are held to. Asbestos in the fabric never becomes a second contract with a second crew. It comes out under our own licence, and our asbestos removal service sets out how each load is documented.
You sign; the rest runs on our side:
What the building is made of moves the number. So does asbestos, whether an excavator and truck can reach the structure, and how much material is recyclable rather than tipped. A square metre rate hides all of that, so we publish none and will not price a demolition down the phone.
We look first and quote after. Where the demolition is one stage of a longer build, the quote prices the stage in front of us and says in writing where it stops. Works, approvals and disposal are itemised, and that figure is what you pay: no hidden fees, no variations. Bring us a written quote from another contractor and we will beat it.
The same crews and licences work across Inner West Sydney, and the register we read for a Rozelle block covers the suburbs beside it:
Yes, the entries already recorded against that street number. They show what scope has been sought there and how far each attempt got, cheaper to learn before drawings are paid for.
The quote names what the stage includes and where it stops, and the clearance certificate closes our part. Anything your builder needs past that line is priced before it happens, never added afterwards.
Tell us the date at the site assessment and you will get an honest answer on whether the approvals and disconnections ahead of it fit. We will not book a start we cannot hold, because every trade behind us pays for that.
In the council registers we checked, every address carrying that postcode is a Rozelle address, and every one is assessed by Inner West Council. The suburbs beside you have postcodes of their own and largely the same council.
Get a Response With in 24 Hours.
A Rozelle block arrives with a record of its own, and reading it is the cheapest hour spent on the job. Give us the street number and a sentence on what has to go, and back come the entries already sitting on that address, the approval route the work qualifies for, and one written price. Call 0455 888 819 or email info@superdemolition.com.au.